Deepin 2014.2 is about to be released. In order to ensure the quality of the version of Deepin 2014.2, now we are conducting the internal testing activities of 2014.2 for the second time.
Testing Schedule
Dec. 13, 2014:The testing event of this time began.
Dec. 13, 2014——Dec. 18, 2014:Testing will be done and the testing report will be uploaded.
Dec. 18, 2014:The testing report will be collected. The testing event of this time will end.
Testing Methods
1.The downloading address and password will be sent in a private letter from the Forum.
2. After installing the internally tested ISO of Deepin 2014.2, please test according to “Feedback Report of Internally Testing ISO of Deepin 2014.2 for the Second Time.doc”.
3. Please finish testing before Dec. 18, 2014 and upload "Feedback Report of Internally Testing ISO of Deepin 2014.2 for the Second Time.doc” to this post.
Attentions
1. This internal testing event is limited to members of Internal Testing Group. How can you join in Internal Testing Group?
2. Members of Internal Testing Group attend this event by default.
3. Members who don’t give a feedback of the testing event four times consecutively will lose eligibility as a member of Internal Testing Group.
4. Please don’t privately spread the ISO internally tested this time, or you’ll lose the internal testing eligibility.
Thanks
Thank those members very much who participate in the internal testing event of this time.
Hi, I've tested this version of Deepin 2014.2 Beta 2.
I think there are some problems.
The only way to improve the Distro is return to a XFCE base.
Unity and Compiz are not suitable to this Operating System.
AN EXAMPLE: DeepinX-IT shows that a Xubuntu Base is faster than an Ubuntu base.
See DeepinX-IT Project at the following link:
- DeepinX-IT by FrancoFait
Deepin 2014.2 is about to be released. In order to ensure the quality of the version of Deepin 2014.2, now we are conducting the internal testing activities of 2014.2 for the second time.
Testing Schedule
Dec. 13, 2014:The testing event of this time began.
Dec. 13, 2014——Dec. 18, 2014:Testing will be done and the testing report will be uploaded.
Dec. 18, 2014:The testing report will be collected. The testing event of this time will end.
Testing Methods
1.The downloading address and password will be sent in a private letter from the Forum.
2. After installing the internally tested ISO of Deepin 2014.2, please test according to “Feedback Report of Internally Testing ISO of Deepin 2014.2 for the Second Time.doc”.
3. Please finish testing before Dec. 18, 2014 and upload "Feedback Report of Internally Testing ISO of Deepin 2014.2 for the Second Time.doc” to this post.
Attentions
1. This internal testing event is limited to members of Internal Testing Group. How can you join in Internal Testing Group?
2. Members of Internal Testing Group attend this event by default.
3. Members who don’t give a feedback of the testing event four times consecutively will lose eligibility as a member of Internal Testing Group.
4. Please don’t privately spread the ISO internally tested this time, or you’ll lose the internal testing eligibility.
Thanks
Thank those members very much who participate in the internal testing event of this time.